Customization: | Available |
---|---|
After-sales Service: | Replacement |
Warranty: | Replacement |
Still deciding? Get samples of US$ 5/Piece
Request Sample
|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Item: Cage Terminal for Energy Meter / LUG TERMINAL COLLAR / Terminal Lugs
Rated Current | Screw | Steel Sheet Thickness (mm) | Width×Height (mm²) | Torque (Nm) |
20A | M3 | 0.8 | 3.6×1.2 | ≥0.8 |
40A | M4 | 1.2 | 5.5×6.5 | ≥1.5 |
60~80A | M5 | 1.5 | 7.5×9, 8×10 | ≥2.5 |
100~120A | M6 | 1.5/2.0 | 8×12 | ≥3 |
≥150A | M8 | 2.0 | 10×14 | ≥5 |
Item name | Metal Stamping Parts |
Materials available | stamping, welding, and CNC machining , die casting, permanent mold casting, forging |
Design | We use the most advanced mould design software Auto CAD, Pro/E, Solidworks, UG (dwg, dxf, IGS, STP, X-T) |
Production Shape | Various shapes are available |
Processing Type | Multistep Progressive Dies |
Tolerance | as per customers' requirement. |
Material | Iron, Aluminum, Carbon Steel, Brass, Stainless steel etc. |
Surface Treatment | Anodize, Chromate, Electrolytic Plating, Nickel Plating, Galvanize, Tempered, Paint, Powder Coating, Polish etc. |
Type | Cold stamping |
Industry Of Use | Manufacturing Machinery,Electronics,IndustrialEqupment,Electrical, Construction&Decoration,Lighting,Auto Accessories,Transportation,Medical,Computer Products,Agriculture & Food etc. |
Sample Lead-time | Within 1day for samples available from our stock About 1-2weeks for custom samples |
Mass Production Lead-time | 3-7 weeks after receiving deposit |
Payment Terms | EXW/FOB/CFR/CIF Qingdao or any other airport or seaport, China |
Payment | 30% deposit, balance against B/L copy |
Delivery Time | 25-60 days based on the different products |
Package | Carton,Wooden Case or as Required |
Service Type | OEM & ODM |
Inspection | In-house or third party, all the products are strictly inspected by skilled QC |